Last Updated: 2023-10-12By Categories:
box-5

Full project management for Emerald & Scenic Cruises on board Ultra Luxury Yacht’s

Cabin conversion works were done. Production & Installation of shower modules, drain & water supply systems, exhaust systems montage. Interior Outfitting, Design & Engineering, Furniture Production, Refurbishment.

• Full dismounting works
• Electrical works
• Wall preparation and covering
• Floors(marine polyflor, vinyl installation, wooden floor vanishing)
• Ceiling works(shifting and montage of sprinkler systems)
• Furniture (production & installation onboard)
• Outdoor installation works
• HVAC(heating, ventilation, and air conditioning)
• Plumbing(water supply, vacuum drain pipes & vacuum interface unit installation)

Donec sollicitudin molestie
Vivamus suscipit tortor eget
Mauris blandit aliquet

Related projects